Skip to content

Full OS $99 USD per location, per month, after a 60-day free trialFirst 100 shops: 90-day pays-for-itself guarantee Start as a founding shop

Product · Transmission shop management software

Diagnosis first. The transmission shop runs on the case.

BayStacker is transmission shop management software that carries a unit from the initial complaint and VIN decode to the teardown build sheet, core credit and invoice. Eight modules work the record in the order the shop works the car.

The diagnosis

The case comes before the work order.

01Diagnosis case · Analysis A

A ranked hypothesis, held as a draft.

The complaint, the decoded VIN and the codes go on one case. Analysis A ranks the likely cause against the transmission family, shows the inputs it used and names the evidence still missing.

  • Analysis A waits for a decoded VIN
  • Confidence and missing evidence on the same screen
  • A person confirms the conclusion, not the model

Diagnosis case · RO-24017

2021 Ford F-150 · 10R80

VIN 1FTFW1E59MFB38206

Analysis A · Draft

Complaint

Symptom
Transmission shudder
Conditions
35–50 mph · Warm · Light throttle
Frequency
Intermittent
Codes
P0741 · P07F7

VehicleVIN decoded

Family
Ford 10R80 (10-Speed SelectShift)

Analysis A

Torque converter clutch slip / valve body hydraulic instability

Confidence72%

Still unproven: Pan inspection photos · Line pressure capture

“Ranked, with its inputs, and still a draft.”BayStacker’s own components, showing the records of its certification test shop — not a customer’s data. Repair-order, VIN and part numbers are illustrative.

02Evidence ladder

A conclusion shows what it rests on.

Symptom, observed behaviour, codes and root cause each read Recorded or a dash. Every input under the conclusion says who recorded it, and the confidence names its basis.

  • Scan, road test, fluid and pan photo attach to the case
  • A thin case never reads as finished

Evidence · RO-24018

2020 Chevrolet Silverado 1500 · 8L90

Evidence ladder

Symptom
Recorded
Observed behaviour
Recorded
Codes
Recorded
Root cause
Recorded

Inputs

TCC slip is present during the warm road test.PersonP0741 · P0796
Pan inspection: clutch material and valve-body wear documented before teardown.PersonPan photo

Root cause

Worn torque converter clutch and hydraulic instability in the valve body.

Conclusion
Confirmed
Confidence
91%
“Nothing on the ladder is checked until it is recorded.”

The job

Then the work moves, and every hold is on the record.

03Work-order board

The hold is on the row.

Each open repair order with its phase and its state. A part the shop marked blocking turns the row to Waiting on parts, so the hold is read, not remembered.

  • State comes from the record, not a typed status
  • Time in phase on every row
ROVehiclePhaseStateIn phase
RO-240172021 Ford F-150Test ValidationWaiting on parts—
RO-240182020 Chevrolet Silverado 1500BuildWaiting on parts—
“Where each repair is, and what is holding it.”— Work orders

04Parts requests · inspector

Where the part stands, not where it was ordered.

A parts request opens in the inspector: requested, allocated and installed as three counts, the purchase order and its status, the landed cost and how it is charged.

  • Requests and purchase orders on the record; ordering happens at the supplier
  • A blocking part holds the repair on the board
“Allocated is not installed.”— Parts request · RO-24017

05Build sheet · unit and core

The build is a record. The core is a debt.

The build sheet names the failure mode, each component’s work and torque, the fluid and the hours against plan. The unit carries its torque converter, valve body and case core until the vendor’s credit lands.

  • A build record with each measurement
  • Converter, valve body and case cores tracked until credit lands

Build sheet · RO-24018

2020 Chevrolet Silverado 1500 · 8L90

TCC slip / valve-body pressure loss

ComponentWorkTorque
Torque converterReplaced42 lb-ft
Valve bodyRebuilt105 in-lb
PumpMachined18 lb-ft
Fluid
DEXRON ULV · 10.5 qt
Hours
5.25 of 12.5 h planned

Unit · RO-24017

2021 Ford F-150 · 10R80

VIN 1FTFW1E59MFB38206

Unit

Transmission
Ford 10R80 (10-Speed SelectShift)
Repair route
Rebuild in house
Planned labour
12.5 h
Plan total
$2,800.00

CoreLogged

Core
CORE-0412
Status
Pending return
Condition
Good
Value
$350.00
Returns to
Certification Transmission Supply
“A returned core is not money until the credit lands.”

The money

The invoice waits for proof.

06Verification · QC gate

The repair is proven before it is billed.

A road test and a code recheck prove the repair. On a diagnosis-managed job, the invoice, delivery and closeout stay locked until verification passes.

  • The gate opens on passed or waived, nothing else
  • A supplement waits for sign-off before the build goes on

Work order · RO-24018

2020 Chevrolet Silverado 1500 · 8L90

Build
  1. Diagnosis
    Root cause confirmed
  2. Supplement
    $450.00 · Pending
  3. Build
    5.25 of 12.5 h
  4. Verification
    Road test · Code recheck
  5. Invoice
    —
“The invoice waits for verification, and verification waits for the build.”

07Invoice · customer links

The invoice opens after QC. The customer’s link does one thing.

Until verification passes, the Money tab offers no invoice, showing Locked: QC required. The estimate goes to the customer as a link that approves that estimate and nothing else.

  • Payments are recorded on the invoice, not processed

Money · RO-24018

2020 Chevrolet Silverado 1500 · 8L90

Build

Invoice

Not invoiced yetLocked — QC required.

The invoice form appears after verification passes.

“Locked — QC required.”— Money tab

Estimate · RO-24017

2021 Ford F-150 · 10R80

sent
Subtotal
$2,800.00
Tax
$231.00
Total
$3,031.00
The customer’s approval link — opening it is their decision:baystacker.com/approve/:token
“The link approves this estimate, and nothing else.”— Estimate

08Reports

Reports that start from the job.

Rebuild verification, QC bottlenecks, comebacks by transmission family, core aging: each report is defined in one line and read from the records the floor works.

  • Grouped in the order each job reads them
  • The shop’s ledger, including chart of accounts, payables and payment reconciliation, beside them
“Each report, and the one line that defines it.”— Reports, three of its groups

See it on a job that already came back.

A walkthrough runs Analysis A on the shop’s own last rework. Nothing to install and nothing to migrate to look at it.